Submission Package Checklist
Note:
This Submission Package Checklist is not required for home construction
using one of the plans on our website or plans created or modified by our
architect.
The checklist below contains all plans and items
required by our Architectural Review Board (A.R.B.) for the review of your
project. Please send this checklist to your architect and/or engineer of choice along with a current copy of the
Building
Guidelines that must be followed to ensure
efficiency through the review process.
1. Parcel Number and Survey
2. Site Plan - must include:
-
Parcel dimensions according to
survey
-
Drawing scale
-
Building(s)/roof(s) dimensions
and position on site plan
-
Accessory dwellings and/or
structure dimensions and position on site plan (if applicable)
-
Recycling, trash containers
and sanitary structures (if applicable)
-
Water supply and collection
system (if not using local water company)
-
All setbacks
-
North indicator
3. Floor Plan - must include:
-
Area chart showing: i. Gross area
of building (base on outside dimensions), ii. Sum of veranda, stair and
platform areas (and all other areas not considered part of the living or
commercial area), and iii. Sum of items above (i. + ii.) considered total
building area.
-
Drawing scale
-
North indicator
-
Name each area/room
-
Windows, doors and openings
(on separate schedule with specifications and dimensions)
-
Staircases, platforms and
decks (if applicable)
-
Fences and privacy walls (if
applicable)
-
Accessory dwellings and/or
structures (if applicable)
-
Recycling, trash containers
and sanitary structures (if applicable)
-
Water supply and collection
system (if not using local water company)
-
Material specifications
-
Dimension all drawings
4. Building Sections - must
include:
-
Dimension from grade to highest
point of structure
-
Drawing scale
-
Roof specifications and pitch
-
Windows, doors and openings
-
Staircases, platforms and
decks (if applicable)
5. Elevations - must include:
-
Drawing scale
-
Windows and doors
-
Staircases, platforms and
decks (if applicable)
-
Fences and privacy walls (if
applicable)
-
Accessory dwellings and/or
structures (if applicable)
-
Water supply and collection
system (if not using local water company)
-
Exterior materials, colors and
specifications
-
Signage specifications and
location (for commercial buildings)
-
Dimension all drawings
Please note that approval by the Architectural Review Board is for
appearance only and does not imply that any review has been made of the
structure, mechanical plans, electrical plans, or plumbing plans, or other
adequacy nor does it imply nor advert the necessity of approval by
appropriate governmental authorities.
Conceptual Submission
Applicants are encouraged to
submit items in a conceptual or preliminary state, in any form, when there
are questionable review items. Such submissions could avoid costly
resubmission and/or delays later in the review process. There is no
review fee for a conceptual submission.
Plan Review
The A.R.B. reviews all
submission packages within 30 days of submission unless designated
otherwise. The response will be emailed, however, may be mailed upon
request.
The A.R.B. may take one of the
following actions:
-
If all plans meet the Building
Guidelines review criteria a letter of approval will follow and you will be
directed to send three copies of your plan to be stamped "Approved."
We will retain two copies. One copy will be returned to you to
retain for your records.
-
If your project either does not meet
the Building Guidelines review criteria or it is not conceptually in
harmony with the Building Guidelines a denial letter will follow with an
explanation of insufficiencies.
Review Fees
-
There is a one hundred dollar
(US$100.00) review fee that includes preliminary and final review for all
review category submissions. This must be included as part of the
initial submission package.
-
Fee for revision to a
previously approved plan is one hundred dollars (US$100.00). This
must be included as part of the revision package.
-
There is an additional one
hundred dollar (US$100.00) fee charged to review any submission package
that has been previously denied by the A.R.B. if it does not meet the
Building Guidelines review criteria or it is not conceptually in harmony
with the Building Guidelines.
|